Foyer Plinth

Foyer Plinth install

Install notes and site windows for Foyer Plinth.

Top400 x 400
Height900 mm
FinishOil
FootBrass
Lead2-3 weeks
CareWipe

Email atelier@ for a tailored install brief.

Delivery and handling on arrival

Our team delivers using a closed bakkie, with the plinth wrapped in thick felt to avoid knocks. It’s easiest if one or two adults are on site to help manoeuvre the plinth through tight passages or up stairs. At delivery, we’ll walk you through how to unbox and inspect for any bumps picked up on the road. The brass foot comes attached, so there’s no need for extra steps.

Placement, levelling and care in first week

Place the plinth on a clean, even floor, tiles, wood or screed all work well. If the floor is uneven, use felt pads on the brass foot to prevent rocking. For high-traffic spaces, we suggest positioning the plinth away from swinging doors or busy corridors. In the first week, let the timber acclimatise: wipe down daily with a dry cloth, and avoid setting heavy objects on top until the oil has cured fully.

  • Felt pads supplied on request
  • No assembly on site needed
  • Acclimatise timber before loading

What we need before installation

To help us plan delivery, send us a quick floor measurement, photos of the space, and let us know about stairs or lifts. For galleries, share the weight and base size of the artwork going on top so we can check centre-of-gravity. Any special requests, matching to a panelled wall, or a curved stoep, just mention in your email to atelier@creationafrica.co.za.

What customers say

Talk to the atelier

atelier@creationafrica.co.za · Woodstock, Cape Town